最近日本中文字幕中文翻译歌词,www 17c com,特级婬片A片AAA毛小雪,亚洲精品在线视频

EN | 中文
Export Sales
Contact Us
Korea, Japan, India, Pakistan, Nepal, Bangladesh, Sri Lanka, Singapore, Malaysia, Thailand, Mongolia
  • WechatWhatsApp
    Ashley Quan

    Cell : +86 139 10174313Tel: +86 10 89411982Fax: +86 10 89411980Email: asia@hjglass.com.cn

South America, Australia, North America, Philippines, Myanmar, Indonesia, Cambodia, Vietnam
  • WechatWhatsApp
    Julie Wu

    Cell : +86 138 26203956Tel: +86 10 89411982Fax: +86 10 89411980Email: am-aus@hjglass.com.cn

Middle East, Europe, Africa
  • WechatWhatsApp
    Sami Zhang

    Cell : +86 138 10073939Tel: +86 10 89411982Fax: +86 10 89411980Email: sales@hjglass.com.cn

After-Sale Service
  • China Domestic Office Liu Lin

    Tel: 010-89411972 / 73
    Fax: 010-89411975
    Email: service@hjglass.com.cn

  • Export Department Amy Guan

    Tel: +86 10-89411982
    Fax: +86 10-89411980
    Email: hhj@hjglass.com.cn

    WhatsApp Wechat
Common Problem
  • QRoutine Maintenance for Press Machine

    A1. Clean up the sundries on the equipment surface and around in time to keep the working environment clean and tidy
    2. Replace seriously worn or damaged parts in time to avoid equipment failure caused by part failure
    3. Wipe the dust on the suction cup surface and photoelectric sensor surface with a rag every day
    4. Check whether the circuit and air circuit plug connections are firmly connected once a week
    5. Check whether the bolts of moving parts are loose and fall off once a week
    6. Lubricate and maintain moving parts once a month (gear, rack, sprocket, chain, guide rail, etc.)
    7. Clean the dust of the electric control cabinet with a vacuum cleaner once a month (it is strictly prohibited to blow the electrical components directly with compressed air)
    8. Clean the dust on the equipment surface once a month
    9. It is recommended to contact the manufacturer and send professional after-sales personnel to carry out full maintenance of the equipment once a year

    +-
  • QRoutine Maintenance for Washing Machine

    A1. Clean up the sundries on the equipment surface and around in time to keep the working environment clean and tidy
    2. Replace seriously worn or damaged parts in time to avoid equipment failure caused by part failure
    3. Wipe the dust on the suction cup surface and photoelectric sensor surface with a rag every day
    4. Check whether the circuit and air circuit plug connections are firmly connected once a week
    5. Check whether the bolts of moving parts are loose and fall off once a week
    6. Lubricate and maintain moving parts once a month (gear, rack, sprocket, chain, lead screw, guide rail, etc.)
    7. Clean the dust of the electric control cabinet with a vacuum cleaner once a month (it is strictly prohibited to blow the electrical components directly with compressed air)
    8. Clean the dust on the equipment surface once a month
    9. It is recommended to contact the manufacturer and send professional after-sales personnel to carry out full maintenance of the equipment once a year

    +-
  • QRoutine Maintenance for Spacer Bending Machine

    A1. Clean up the sundries on the equipment surface and around in time to keep the working environment clean and tidy
    2. Replace seriously worn or damaged parts in time to avoid equipment failure caused by part failure
    3. Wipe the dust on the suction cup surface and photoelectric sensor surface with a rag every day
    4. Check whether the circuit and air circuit plug connections are firmly connected once a week
    5. Check whether the bolts of moving parts are loose and fall off once a week
    6. Lubricate and maintain moving parts once a month (guide rail, etc.)
    7. Clean the dust of the electric control cabinet with a vacuum cleaner once a month (it is strictly prohibited to blow the electrical components directly with compressed air)
    8. Clean the dust on the equipment surface once a month
    9. It is recommended to contact the manufacturer and send professional after-sales personnel to carry out full maintenance of the equipment once a year

    +-
  • QRoutine Maintenance for Desiccant Filling Machine

    A1. Clean up the sundries on the equipment surface and around in time to keep the working environment clean and tidy
    2. Replace seriously worn or damaged parts in time to avoid equipment failure caused by part failure
    3. Clean the butyl glue that may remain on the surface of structures related to glue supply and blocking every day
    4. Check whether the circuit and air circuit plug connections are firmly connected once a week
    5. Check whether the bolts of moving parts are loose and fall off once a week
    6. Lubricate and maintain moving parts once a month (gear, rack, sprocket, chain, lead screw, guide rail, etc.)
    7. Clean the dust of the electric control cabinet with a vacuum cleaner once a month (it is strictly prohibited to blow the electrical components directly with compressed air)
    8. Clean the dust on the equipment surface once a week (especially the molecular sieve dust attached to the exposed shaft rod of the cylinder)
    9. It is recommended to contact the manufacturer and send professional after-sales personnel to carry out full maintenance of the equipment once a year

    +-
  • QRoutine Maintenance for Butyl Extruder

    A1. Clean up the sundries on the equipment surface and around in time to keep the working environment clean and tidy
    2. Replace seriously worn or damaged parts in time to avoid equipment failure caused by part failure
    3. Check whether the circuit and air circuit plug connections are firmly connected once a week
    4. Check whether the bolts of moving parts are loose and fall off once a week
    5. Clean the dust of the electric control cabinet with a vacuum cleaner once a month (it is strictly prohibited to blow the electrical components directly with compressed air)
    6. Clean up the butyl rubber that may remain in the rubber nozzle, conveyor belt, auxiliary pressure roller and other structural parts in time
    7. It is recommended to contact the manufacturer and send professional after-sales personnel to carry out full maintenance of the equipment once a year

    +-
  • QPLC

    A1. Dust removal shall be carried out every week. During dust removal, the power supply of the control system shall be turned off, and the dust on the surface shall be cleaned with a vacuum cleaner.
    2. Check the connection of I / O modules every week to ensure that all sockets, terminal boards and modules are well connected and firmly placed. When the environment of PLC control system is often subject to vibration that makes the terminal connection loose, this inspection should be carried out frequently;
    3. Check the PLC battery every week: the random access memory (RAM), counter and auxiliary relay with holding function stored in the PLC are protected by lithium battery. The service life of lithium battery is about 5 years. When the voltage of lithium battery gradually decreases to a certain extent, the battery voltage reduction indicator on the PLC basic unit is on. Remind the user that the program supported by lithium battery can be retained for about a week, and the battery must be replaced.
    For example, there is a "bat" red LED indicator on the CPU module of the PLC. When this led is on, it indicates that the service life of the lithium battery in the PLC is almost over (it can last about one week at most). At this time, please replace the new lithium battery as soon as possible to avoid the automatic disappearance of the program in the PLC (when ram is used).

    +-
  • QElectric Machinery

    A1. Dust removal shall be carried out every week. During dust removal, the power supply of the control system shall be turned off, and the dust and oil sludge outside the motor base shall be removed in time.
    2. Check whether the motor operates normally every week without abnormal noise and heating.
    3. Check whether the wiring screws of the junction box are loose and burned every week.
    4. Weekly insulation inspection. During the use of the motor, the insulation resistance shall be checked frequently, and attention shall be paid to check whether the grounding of the motor shell is reliable.
    5. For the maintenance and repair of the motor cooling fan every week, the dust or foreign matters on the cooling fan shall be cleaned in time to prevent the abnormal temperature rise of the motor caused by the abnormal operation of the fan.

    +-
  • QEncoder

    ACheck whether the encoder signal is normal and whether the encoder coupling is loose every week. If it is loose, replace the coupling in time or replace the encoder. If the encoder signal fails, the inflatable partition will collide with the glass and damage the partition.

    +-
  • QTravel Switch

    ACheck whether the signals of all travel switches are normal every week. The travel switch is used for mechanical travel limit or zero positioning, which can be verified by the input and output signals of PLC or touch screen. If there is any problem, please replace it in time.

    +-
  • QSensor

    A1. Check whether the signals of all sensors are normal every week, which can be verified by the input and output signals of PLC or touch screen. If there is any problem, please replace it in time.
    2. Dust removal shall be carried out every day. If there is floating dust on the surface of the touch screen, please wipe it with a clean anhydrous cloth. Do not wipe it with ethanol, gasoline and other organic solvents.
    3. Check whether the fastening nuts of all sensors and the fasteners of sensor support are loose every week. If there are problems, adjust and retighten them in time.

    +-
  • QTouch Screen

    ADust removal shall be carried out every day. If there is floating dust on the surface of the touch screen, please wipe it with a clean anhydrous cloth. Do not wipe it with ethanol, gasoline and other organic solvents.

    +-
  • QCheck the Power Supply Voltage Regularly

    ACheck the power supply voltage every week;
    3P 380V / 1p + n 220V, according to national regulations, its fluctuation range is ≤ 10%.
    24V power supply, fluctuation amplitude ≤ 5%

    +-
  • QLow Voltage Electrical Parts Of Control Cabinet

    ADust removal shall be carried out every week. During dust removal, the power supply of the control system shall be turned off, and the dust on the surface shall be cleaned with a vacuum cleaner.

    +-
  • QFrequency Converter, Servo Driver

    ADust removal shall be carried out every week. During dust removal, the power supply of the control system shall be turned off, and the dust on the surface shall be cleaned with a vacuum cleaner.
    The parameters of frequency converter and servo driver have been set before leaving the factory. Do not change the parameters of frequency converter without authorization, otherwise the equipment will not operate normally.

    +-
  • Online Message

  • +86 10 89411982
  • 亚洲午夜成人网葡京 | 一级毛片久久久久久久 | 国产精品无码专区A片免费蘑菇 | 一区二区三区中国大乳房熟女 | 国产交换娇妻A片 | 海角精品一区二区 | 亚洲黄色电影免费播放 | 欧一美一性一交一免一费一H一D | 91狠狠色综合久久久夜色撩人 | AA,在线观看视频在线播放 | 无码国产色欲XXXX视频 | 国产又粗又大视频 | 国产精品成人视频 | 四川少妇久久久久丰满免费观看 | 免费看黄色一级片 | 国语自产偷拍精品视频偷97 | 美女被操网站在线观看 | 国产亚洲精品女人久久久久久 | www.777.com男女网站 | 好吊妞免费视频观看 | 国产伦精品一区二区三区免费舒淇 | 一级婬片120分钟试看 | 国产欧美在线观看视频 | 欧美国产XXX视频 | 亚洲在线观看视频 | 欧美一級黃色A片免費看 | 人人爽人人澡人人DVD | 欧美国产一区二区三区四区孕妇 | 一级A片久久久爽爽爽 | 日韩精品一区二区三区四区竹菊 | 91香蕉成人网站 | 国产伦子伦对白在线播放观看 | 国产精品无码久久久久久久密臀 | 麻豆精品一区二区 | 亚综合中文字幕在线观看 | 哪个网址可以看A片 | 人人人人人妻人人人人澡 | 四虎影院www丝袜制服 | 成人AV一区二区三区四区 | 91蜜桃传媒精品久久久一区二区 | 在线观看黄污精品无码13 |